Spektrum RCย 2.9g Long Lead Linear Servo. This is a replacement servo intended for the E-flite UMX Timber X. Package includes one 2.9g long lead linear servo.
This product was added to our catalog on August 22, 2022
$21.49 Original price was: $21.49.$15.04Current price is: $15.04.

Spektrum RCย 2.9g Long Lead Linear Servo. This is a replacement servo intended for the E-flite UMX Timber X. Package includes one 2.9g long lead linear servo.
This product was added to our catalog on August 22, 2022
Brushless
Protek RC 160TBL “Black Label” Low Profile High Torque Brushless Servo (High Voltage/Metal Case)
Reviews
There are no reviews yet.