Spektrum RCÂ 2.9g Long Lead Linear Servo. This is a replacement servo intended for the E-flite UMX Timber X. Package includes one 2.9g long lead linear servo.
This product was added to our catalog on August 22, 2022
$21.49 Original price was: $21.49.$15.04Current price is: $15.04.

Spektrum RCÂ 2.9g Long Lead Linear Servo. This is a replacement servo intended for the E-flite UMX Timber X. Package includes one 2.9g long lead linear servo.
This product was added to our catalog on August 22, 2022
High Voltage
Reviews
There are no reviews yet.